Today Power Shutdown in Chennai 18 September 2019

Power supply will be suspended in the following areas on 18-09-2019 between 9.00 A.M. to 5.00 P.M. for maintenance work. Supply will be resumed before 5.00 P.M. if the works are completed.

S.R.M.C Area: Alappakkam Tablet Factory, Jamal Residence, Telephone Exchange, Alappakkam Road


Porur: One part of Kundathoor main road, one area of ​​Vigneswara Nagar, M.S. Nagar, Bell Nagar, Jayendra Saraswathi Nagar, Amman Nagar, Rajalakshmi Nagar, Kamakshi Nagar, Satyanarayanapuram, Shanmuga Nagar, Jayalakshmi Nagar, Aarti Nagar, Rajaraja Nagar, Bajanai Temple Street, one part of Maulivakkam area, Mankadu Road, A.T Govindaraj Nagar, Ranga Nagar, Lakshmi Nagar, Murugan Nagar, Stalin Nagar, Jyoti Nagar.


Velachery East Side: Periyar Nagar, 100 feet Taramani Annex Road, Udayam Nagar, Amritam Nizhalaya, Barani Street, Bhavaniamman Temple Street, Kalukkuttai, Bharathi Nagar.


Madhavaram: KKR Nagar, Ambedkar Nagar, Kannabiran Temple Street, Thiruvalluvar Street, Sathyaraj Nagar, Jambuli Colony, KKR Estate, Calcutta Shop.


Sitlappakkam Area: Saraswati Nagar, Babu Street, Vaidyalingam Road, Marudupandi Street, U.V Saminathan Street, Ramakrishna Nagar, Raghavendra Nagar, Thirumurugan Road, Sethu Narayanan Street, M.M.D.A Nagar.

For more information, stay tuned with Tamil Typing

Leave a Reply

Your email address will not be published. Required fields are marked *